The Unblockd brand kit.
Logo
Logo use
DoUse the files as supplied, on paper or ink.
Don’tRecolor the blocks or the name.
Don’tStretch, squash, or rotate the logo.
Don’tAdd shadows, outlines, or glows.
Color
Brand colors
Ink
Text, primary buttons, and the logo on light grounds.
#0E1512Paper
The page. Warm paper in light mode.
#F7F6F0Surface
Panels, cards, and inputs on paper.
#FFFFFFLime
One lime element per view.
The accent, kept for the action that needs the reader.
#C5F04A
Status colors
Each status pairs its color with its word. Set the word in the text color for its ground, paper or ink.
- In progress
#17944F#127A3E#6FD394 - Waiting on sponsor
#F2A93B#8A5300#F2A93B - Blocked
#E5533D#B3301C#F07A63
Type
Clear blockers, don’t just report them.
- Typeface
- Space Grotesk
- Weight
- 600
- Use
- Display, headlines, and titles
The sponsor sees progress against each deliverable, with the proof behind it, and answers what needs them in one tap.
Labels, tables, and everything a reader works through are set in Inter. Numbers in status and progress use tabular figures, so columns line up.
- Typeface
- Inter
- Weight
- 400 and 600
- Use
- Body text, labels, and the interface
Product screens
Download Sponsor page as PNG · 2880 × 1988Sponsor page
What a sponsor sees from the email link: progress against each deliverable, and what needs them.
Download Ask card as PNG · 1712 × 894Ask card
A decision with the team's recommendation marked. The sponsor answers in one tap.
Download Plan timeline as PNG · 2272 × 1696Plan timeline
The plan from start to due date, with the status of each deliverable.
Download Connected tools as PNG · 2880 × 1920Connected tools
Settings, Connected tools: read-only links to the tools a team already plans in.
Download Demo video poster as PNG · 1920 × 1080Demo video poster
The poster frame of the product demo video.
About Unblockd
- One line16 words
Unblockd helps projects deliver faster by taking what’s stuck to the sponsor who can clear it.- Short57 words
Unblockd helps projects deliver faster. When work gets stuck, it puts the blocker, and the deliverable it is holding up, in front of the sponsor with one clear ask. An AI agent finds what is stuck and drafts the ask, and the project lead checks and sends it. Sponsors answer from a link and never sign up.- Long140 words
Unblockd helps projects deliver faster by taking what’s stuck to the sponsor who can clear it. It is built for the people who lead client engagements, customer implementations, and internal change projects and answer for the date. Every project gets stuck somewhere. What decides how long is how quickly someone with authority steps in. Unblockd shows the sponsor what is stuck next to the deliverable it is holding up, with one clear ask: a decision, an approval, or a word with the right person. The answer comes straight back to the team, and the work moves again. Teams connect their own AI agents, which find what is stuck in the work and draft the ask. The project lead checks it and decides what the sponsor sees. Sponsors, approvers, and viewers get in by link, with no account and no charge.