Skip to content
Help topics · Wrike

Connect Wrike to Unblockd

Link a Wrike project to an Unblockd project and its tasks come in as tasks, with their status kept in step.

Updated · About the Wrike integration

What Unblockd reads

Unblockd reads your Wrike projects and the tasks in the ones you link to an Unblockd project. You choose which tasks to bring in; each becomes a task under a deliverable, with a link back to Wrike as its first proof. From then on its status follows Wrike.

It’s read-only. Unblockd never creates, edits, or deletes tasks in Wrike.

A task that’s blocked in Wrike opens a blocker your team sees first. Nothing reaches your sponsor until someone on your team chooses to share it.

The access token is encrypted before it’s stored. How Unblockd handles your data.

Before you start

  • In Unblockd, a workspace admin connects Wrike, once for the whole workspace. Members see it in Settings but can’t connect or disconnect it. Anyone on the team can then link it to a project.
  • In Wrike: A Wrike user who can see the projects you want to link.

Connect Wrike

  1. Open Connected toolsSign in to Unblockd and open Settings, then Connected tools.
  2. Press Connect beside WrikeFind Wrike under Most used, or press Show all 33 tools, or type its name in the search box. Then press Connect on its row.
  3. Approve access in WrikeWrike shows the access Unblockd requests and asks you to accept it. Unblockd requests wsReadOnly (read-only access to your Wrike workspace).
  4. Back in UnblockdYou come back to Connected tools, which says “Wrike is connected. Next, link it to a project from the project’s Sources tab.” Its row shows the account and Connected.
  1. Open the project’s Sources tabOpen the project from Projects, then its Sources tab.
  2. Press Link a sourceIt’s under the list of linked sources. If more than one tool is connected, choose Wrike under Tool.
  3. Pick the Wrike projectUnder Wrike project, pick the one this Unblockd project runs on. Only projects the connection can see are listed, and ones already linked here are left out.
  4. Choose where items landUnder New items land in, choose a deliverable, or leave Choose each time. It’s the first choice when you bring items in, and where new items go if automatic import is on.
  5. Press LinkThe Wrike project appears in the Sources list, ready to bring items in.

Starting a new project? On New project, open “Bring work in from a tool”, choose Wrike and the project, and leave “Bring in open items as tasks” on to start with its open tasks. It’s linked as the project is created.

Bring in items

  1. Press Bring in itemsOn the project’s Sources tab, press Bring in items on the Wrike project’s row. Unblockd lists the open tasks that aren’t in this project yet.
  2. Choose the deliverableUnder Add them under, choose the deliverable they belong to. Each item comes in as a task under it.
  3. Choose the tasksTick the tasks you want, search by key or title, or press Choose all. Then press Bring in. Up to 50 come in at a time; run it again for more.

New tasks can also come in on their own. An admin turns on Bring in new items from linked sources in Settings, then Automations, and each source can opt out or pick its deliverable from its ⋯ menu, under New items. Up to 25 come in per sync, checked every hour and on every sync.

How sync works

Wrike's status groups don't separate to do from in progress, so the status name decides that. Each task becomes the first status that matches:

In the Completed or Cancelled group
Becomes: Done
A status with Blocked, On Hold, or Impeded in its name
Becomes: Blocked
A status with In progress, Doing, Underway, Working, or In review in its name
Becomes: In progress
Anything else in the Active or Deferred group
Becomes: To do

Unblockd checks Wrike again when someone opens the project’s Sources tab and the last check is more than 10 minutes old, when you choose Sync now from the source’s ⋯ menu, and once a day. The row shows when it last synced. A large source catches up over a few checks.

  • Done in Wrike finishes the task in Unblockd, because the link back to Wrike already counts as proof. A task that needs a sign-off stays where it is until the sign-off is recorded.
  • Blocked in Wrike marks the task Blocked and opens a blocker for your team only, and posts to your team’s chat channels if you’ve connected any. Someone on your team confirms it and can turn it into an ask for your sponsor. If the task moves on in Wrike, the task follows; the blocker stays open until your team resolves it.
  • A title changed in Wrike changes in Unblockd too. A tool never puts a task In review: that needs a reviewer chosen in Unblockd.
  • Tasks from a tool stay with your team. Your sponsor sees each deliverable’s progress, not the tasks under it.

Disconnect and revoke access

  1. Press DisconnectIn Settings, then Connected tools, press Disconnect on Wrike’s row.
  2. ConfirmIf it’s linked to projects, Unblockd first says how many projects it will unlink. Press Disconnect Wrike to confirm, or Keep.
  • Deleted: the connection, its stored access, and every Wrike project linked through it, across all your Unblockd projects.
  • Kept: tasks already brought in stay as ordinary tasks with their history and proof links. They stop following Wrike. Connect again and relink the same Wrike project, and they follow it again.
  • Wrike keeps the access you granted until it's removed. Remove Unblockd from the apps connected to your Wrike account.

To stop one project following Wrike without disconnecting it for everyone, open the linked Wrike project’s ⋯ menu on the Sources tab and choose Unlink. Its tasks stay, but stop following Wrike.

Troubleshooting

Needs reconnecting
What to do: Wrike turned down Unblockd’s access, for example because it was revoked or the person who connected it left. The row says “Reconnect to keep it in sync.” An admin presses Reconnect and approves access again; linked projects and their tasks carry on.
Retrying
What to do: The row says “Couldn’t reach it on the last try. It will try again.” Wrike didn’t answer the last time Unblockd tried. Nothing is lost; the next sync picks up where it stopped.
Rate limits
What to do: Unblockd reads one item about every 0.65 seconds, up to 200 per check, to stay inside Wrike’s limits. If Wrike still says to slow down, Unblockd stops that check and picks up on the next one. Sync now waits 60 seconds between runs on the same source.
A project is missing
What to do: Only projects the connected account can see are listed. Check its access in Wrike, or reconnect with an account that can see it.
Only an admin can connect
What to do: “Only a workspace admin can connect or disconnect tools.” Ask an admin, or have one change your role in Settings, then Members.
The connection link expired
What to do: “That connection link expired or was started by someone else. Try again from here.” Start again from Connected tools and finish within 10 minutes.
A different account
What to do: “This workspace is linked to a different account for that tool. Disconnect it first.” Each workspace connects one Wrike account. Disconnect the old one first.
Coming soon
What to do: A tool that shows Coming soon instead of Connect can’t be connected yet.

Still stuck? Press Report a problem on Wrike’s row in Connected tools, or choose Report a problem with Wrike from a linked project’s ⋯ menu. One tap sends the tool and what the row shows about the connection (never a key or token) to the Unblockd team, and someone replies by email. You can send 5 reports every hour, or write to hello@unblockd.ai any time.

Connect Wrike now

Open Connected tools in Unblockd and press Connect beside Wrike. You’ll need to be a workspace admin.